2008
DOI: 10.1063/1.2908586
|View full text |Cite
|
Sign up to set email alerts
|

Numerical Simulation of the Cryogenic System of Bepcii

Abstract: The cryogenic system of the upgrade project of Beijing Electron Position Collider (BEPCII) is being built at Institute of High Energy Physics (IHEP). The system has a total capacity of 1.0 kW at 4.5 K for cooling three kinds of superconducting devices, superconducting RF (SRF) cavities, superconducting quadrupole (SCQ) magnets and the superconducting solenoid magnet (SSM). Two sets of refrigerators, each with a capacity of 500 W at 4.5 K are adopted. In order to prepare for the commissioning of the cryogenic s… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2010
2010
2010
2010

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 2 publications
0
0
0
Order By: Relevance