Beijing 2009 International Geophysical Conference and Exposition, Beijing, China, 24–27 April 2009 2009
DOI: 10.1190/1.3603650
|View full text |Cite
|
Sign up to set email alerts
|

Numerical simulation and location analysis of microseismic events

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2019
2019
2019
2019

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…To analyze the impact accurately, the evaluation of the traffic situation during planned special events with and without project construction should be concentrated in a certain area (known as the study area). The determination of the study area is suggested to follow the method of traditional TIA, which has been extensively studied; more details can be obtained through referring to the relevant manuals and standards ( 14 ). The area is ordinarily surrounded by urban major arterial or collector roads.…”
Section: Framework Of Traffic Impact Analysismentioning
confidence: 99%
See 1 more Smart Citation
“…To analyze the impact accurately, the evaluation of the traffic situation during planned special events with and without project construction should be concentrated in a certain area (known as the study area). The determination of the study area is suggested to follow the method of traditional TIA, which has been extensively studied; more details can be obtained through referring to the relevant manuals and standards ( 14 ). The area is ordinarily surrounded by urban major arterial or collector roads.…”
Section: Framework Of Traffic Impact Analysismentioning
confidence: 99%
“…In this paper, considering the data availability and comparability, we utilize the v / c ratio ( v is hourly traffic demand volume and c is the capacity) to determine the LOS of roadway section and utilize average vehicular delay to determine the LOS of intersections. Based on the existing standards ( 14 , 15 ) and observations, we provide an evaluation criterion for the LOS of roadway sections and intersections for project construction induced traffic impact during special events in Table 1.…”
Section: Framework Of Traffic Impact Analysismentioning
confidence: 99%