2021
DOI: 10.1155/2021/5583822
|View full text |Cite
|
Sign up to set email alerts
|

Numerical Analysis of the Hydraulic Fracturing of Pressure Tunnel Lining Based on the 2P-IKSPH Method

Abstract: In order to investigate the fracture mechanisms of the pressure tunnel lining under water-stress coupling, based on the traditional smoothed particle hydrodynamics (SPH) method, the solid-water particle interaction method, and the particle damage conversion algorithm are proposed to realize the hydraulic fracturing process, which is called the 2P-IKSPH method. The “particle domain searching method,” the “birth-and-death particle method,” and the “group discrimination searching method” have also been proposed t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 22 publications
0
2
0
Order By: Relevance
“…2 Under the action of high-speed water flow and high ground stress, these projects suffer from various structural defects after long-term service periods. 3 The occurrence of structural damage will significantly deteriorate the durability, impermeability, and integrity Visual inspection implemented by human inspectors walking along the tunnel has been a practical strategy. 4 However, manual inspection is high-risk, labor-intensive, and time-consuming, especially for long-distance tunnel inspection.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…2 Under the action of high-speed water flow and high ground stress, these projects suffer from various structural defects after long-term service periods. 3 The occurrence of structural damage will significantly deteriorate the durability, impermeability, and integrity Visual inspection implemented by human inspectors walking along the tunnel has been a practical strategy. 4 However, manual inspection is high-risk, labor-intensive, and time-consuming, especially for long-distance tunnel inspection.…”
Section: Introductionmentioning
confidence: 99%
“…2 Under the action of high-speed water flow and high ground stress, these projects suffer from various structural defects after long-term service periods. 3 The occurrence of structural damage will significantly deteriorate the durability, impermeability, and integrity of tunnel structures, further affecting the structural stability.…”
Section: Introductionmentioning
confidence: 99%