2009
DOI: 10.1016/j.coldregions.2009.02.005
|View full text |Cite
|
Sign up to set email alerts
|

Numerical analysis for critical thickness of crushed rock revetment layer on Qinghai–Tibet Railway

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
2
0

Year Published

2010
2010
2019
2019

Publication Types

Select...
6
2

Relationship

1
7

Authors

Journals

citations
Cited by 20 publications
(11 citation statements)
references
References 29 publications
0
2
0
Order By: Relevance
“…Finally, to prevent thawing of the underlying foundation soils during construction, ACE should be built during winter by placing the aggregate material in a frozen state (Goering, 2001). In order for adaptation methods based on natural convection to be effective, a temperature differential resulting in air density instability is required to initiate air movement and thus convective heat transfer within the ACE (Goering and Kumar, 1996;Sun et al, 2005;Sun et al, 2009). This activation temperature differential needs to be considered in relation to the site's predicted climate warming and design life.…”
Section: Heat Extraction Methodsmentioning
confidence: 99%
“…Finally, to prevent thawing of the underlying foundation soils during construction, ACE should be built during winter by placing the aggregate material in a frozen state (Goering, 2001). In order for adaptation methods based on natural convection to be effective, a temperature differential resulting in air density instability is required to initiate air movement and thus convective heat transfer within the ACE (Goering and Kumar, 1996;Sun et al, 2005;Sun et al, 2009). This activation temperature differential needs to be considered in relation to the site's predicted climate warming and design life.…”
Section: Heat Extraction Methodsmentioning
confidence: 99%
“…(2) and 3, respectively, and the effect of the temperature intervals of phase change has been considered. The equations can be expressed [17,18]:…”
Section: The Governing Differential Equationsmentioning
confidence: 99%
“…The construction of the Qinghai-Tibet Express Highway was proposed after the Qinghai-Tibet Railway has been constructed and been officially operational on July 1st, 2007 [1]. However, the successful construction of the proposed Express Highway has still many problems, such as location of the express highway, width and height of embankment, and applicability of various adjusting techniques of cooling ground temperature, etc [2][3][4][5][6][7][8][9][10]. The factors affecting the express highway embankment stability in cold regions mainly include the climatic, geological, geographical and engineering ones, etc [1][2][3].…”
Section: Introductionmentioning
confidence: 99%