2014
DOI: 10.4028/www.scientific.net/amm.580-583.1072
|View full text |Cite
|
Sign up to set email alerts
|

Numbering Analysis of Ground Settlement by Shield Method Based on the Model of Corrected ‘Equivalent Circle Zone’

Abstract: Through the analysis of ‘gap parameter’ and ground movement pattern in shield tunnel, this paper researched and corrected the model of ‘equivalent circle zone’ proposed by predecessors. The ‘equivalent circle zone’, which is a comprehensive reflection of shield gap, grouting filling and stratum perturbation, is considered to be unequal thickness in this paper. With the measured data of practical shield tunneling, the unknown parameters of corrected ‘equivalent circle model’ can be obtained by back analysis thr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 1 publication
(2 reference statements)
0
0
0
Order By: Relevance