2005
DOI: 10.2172/877756
|View full text |Cite
|
Sign up to set email alerts
|

Nuclear car wash status report, August 2005

Abstract: interrogating detector array, and bring the container to a safe stop. The container can then be returned to its initial "start" position, and the process repeated. The nominal operating parameters for the system are as follows: ß Container: standard 6.1 m length ß Container speed: nominally 20 cm/s (40 ft/min) ß Length of container travel: nominally 9.1 m total travel on 15 m long rails ß Operation: remote, from an operators station ß Positional feedback: encoder and video camera/monitor ß All operational proc… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2014
2014
2014
2014

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 6 publications
0
0
0
Order By: Relevance