2020
DOI: 10.3926/jiem.2755
|View full text |Cite
|
Sign up to set email alerts
|

Novel availability and performance ratio for internal transportation and manufacturing processes in job shop company

Abstract: Purpose: Purpose of this study includes the quantification of the impact of transportation efficiency onto the workstations the transportation serves in term of throughput and total lead time elapsed by product. Besides, it aims to synchronize the capacity available among workstations throughout a production line by studying the upper limit of throughput could be afforded by each workstation as well as their connection with each other. This study is also done on the purpose of promoting fulfillment of customer… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 46 publications
0
2
0
1
Order By: Relevance
“…OEE didefinisikan sebagai metrik atau ukuran untuk mengevaluasi efektivitas peralatan yang berupaya untuk mengidentifikasi kehilangan produksi dan kehilangan biaya lain yang tidak langsung dan tersembunyi dan memiliki kontribusi besar terhadap biaya total produksi [13]. Overall Equipment Effectiveness (OEE) merupakan metode yang dapat digunakan untuk mengukur efektivitas mesin yang didasarkan pada pengukuran tiga rasio utama, yaitu Availability ratio, Performance ratio, dan Quality ratio [14][15][16].…”
Section: Pendahuluanunclassified
“…OEE didefinisikan sebagai metrik atau ukuran untuk mengevaluasi efektivitas peralatan yang berupaya untuk mengidentifikasi kehilangan produksi dan kehilangan biaya lain yang tidak langsung dan tersembunyi dan memiliki kontribusi besar terhadap biaya total produksi [13]. Overall Equipment Effectiveness (OEE) merupakan metode yang dapat digunakan untuk mengukur efektivitas mesin yang didasarkan pada pengukuran tiga rasio utama, yaitu Availability ratio, Performance ratio, dan Quality ratio [14][15][16].…”
Section: Pendahuluanunclassified
“…The 2 pillars of the TPM proposed for the bottleneck area were applied, that is, for the garment machines (straight and overlock) progressive training was made, autonomous maintenance was introduced with instructions for activities that can be carried out by the operators providing them with independence, list of resources necessary for maintenance, breakdown format and fault registration that allows us to reduce the breakdowns of the machines. The indicators of mean time to repair (MTTR) and mean time of failure (MTBF) are evaluated in the simulation software, proposes the author [25]. Therefore, availability increased by 5.99%.…”
Section: Tpmmentioning
confidence: 99%
“…In this context, the proposal for performance measurement has been taking place through the Overall Equipment Effectiveness (OEE), an analytical method used to measure the performance of equipment by proportionally measuring the ratio of its maximum capacity emphasising losses [57]. The focus of this application proposal is to produce with minimal losses [58][59][60][61][62].…”
Section: Model For Measuring Equipment Performancementioning