Day 3 Wed, January 15, 2020 2020
DOI: 10.2523/iptc-20082-ms
|View full text |Cite
|
Sign up to set email alerts
|

Non-Productive Time Reduction In Overpressured Reservoirs Through Seamless Integration of MPD, LWD And RSS Technologies.

Abstract: This case study shows a cooperative implementation of managed pressure drilling (MPD), logging while drilling (LWD) and rotary steerable system (RSS) technologies to prevent non-productive time (NPT) while drilling through a section with a tight pressure window in a highly over-pressured reservoir in the US. Drilling risks were proactively reduced by providing real time data transmission for reservoir characterization and identification of critical well sections. The bottom hole assembly (BHA) w… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles