2014
DOI: 10.2749/101686614x13830790993005
|View full text |Cite
|
Sign up to set email alerts
|

New Shear Connectors Based on PBL Shear Connector For Composite Arch Members

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
7
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 9 publications
(7 citation statements)
references
References 0 publications
0
7
0
Order By: Relevance
“…Zheng et al [41] highlighted the importance of hole geometries in PBL shear connectors for shear capacity evaluation and investigated the performance of circular and long-hole PBL ribs through pushout testing. Fan and Zhou [42] proposed a new PBL connector, perfobond hoop (PBH), comprising PBL with stirrups embedded in the hole for steel-concrete composite arch elements, particularly for bridges. The experimental results showed the better mechanical property and higher shearing capacity of perfobond hoop than PBL connectors.…”
Section: Perfobond Ribs Shear Connectorsmentioning
confidence: 99%
“…Zheng et al [41] highlighted the importance of hole geometries in PBL shear connectors for shear capacity evaluation and investigated the performance of circular and long-hole PBL ribs through pushout testing. Fan and Zhou [42] proposed a new PBL connector, perfobond hoop (PBH), comprising PBL with stirrups embedded in the hole for steel-concrete composite arch elements, particularly for bridges. The experimental results showed the better mechanical property and higher shearing capacity of perfobond hoop than PBL connectors.…”
Section: Perfobond Ribs Shear Connectorsmentioning
confidence: 99%
“…Herein, a modified formula for calculating shear capacity was also proposed by considering rib height and spacing (Ahn et al, 2010). On the basis of the PBH connector extracted from the mechanical properties of the PBL shear connector (Valente and Cruz Paulo, 2004; Zhan et al, 2020; Zhou, 2014), a simplified formula of PBH was presented by the method of shear friction theory and multiple linear regression analysis (Li et al, 2019). First and foremost, according to the failure modes between the nail legs and connecting member materials, Hu derived the estimation equation of PBL shear connectors from critical transverse loading (Hu and Zhang, 2021).…”
Section: Introductionmentioning
confidence: 99%
“…Shear connectors are the pivotal elements that bond the steel beam to the concrete slab. Stud and Perfobond Leiste (PBL) shear connectors are mostly used in engineering thus far [1]. Stud shear connectors can resist longitudinal shear force through the stud rod, and a large part resists the lifting force of the concrete slab.…”
Section: Introductionmentioning
confidence: 99%