2009 IEEE International Symposium on Parallel &Amp; Distributed Processing 2009
DOI: 10.1109/ipdps.2009.5161118
|View full text |Cite
|
Sign up to set email alerts
|

New sequential and parallel algorithm for Dynamic Resource Constrained Project Scheduling Problem

Abstract: This paper proposes a new Evolutionary Algorithm for the Dynamic Resource Constrained Project Scheduling Problem.This algorithm has new features that get around some problems like premature convergence and other ones. The indirect representation approach was used because it allows the construction of a feasible solution from any input priorities. A parallel version is also proposed, making good use of multicore processors available nowadays. The results of sequential and parallel versions were very significant… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
6
0

Year Published

2010
2010
2022
2022

Publication Types

Select...
2
1
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(6 citation statements)
references
References 11 publications
(15 reference statements)
0
6
0
Order By: Relevance
“…A new representation for DRCPSP solutions have been adopted since then [12,13]. This representation handles priorities for the scheduling of tasks in a similar way as the random-keys approach [5] does.…”
Section: Literature Reviewmentioning
confidence: 99%
See 3 more Smart Citations
“…A new representation for DRCPSP solutions have been adopted since then [12,13]. This representation handles priorities for the scheduling of tasks in a similar way as the random-keys approach [5] does.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The second Evolutionary Algorithm which uses the indirect representation is called EA ages and was proposed in [13]. EA ages is the best heuristic known for DRCPSP and its features are going to be reviewed in Subsection 3.1.…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…They aimed to minimize the deviations between the baseline schedule and the actual schedule.Van have addressed a multiobjective problem that maximizes both schedule stationarity and the probability of completing projects in time. They proposed a reactive resource-constrained project scheduling method foreseen for the problem and tested the method's performance Da Silva, Ochi, and Santos (2008). developed a new example for the dynamic resource-constrained project scheduling problem.…”
mentioning
confidence: 99%