Eighth IEE International Conference on Developments in Power System Protection 2004
DOI: 10.1049/cp:20040127
|View full text |Cite
|
Sign up to set email alerts
|

New protection co-ordination methods in the presence of distributed generation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
10
0
5

Year Published

2007
2007
2016
2016

Publication Types

Select...
5
3

Relationship

1
7

Authors

Journals

citations
Cited by 19 publications
(15 citation statements)
references
References 0 publications
0
10
0
5
Order By: Relevance
“…A protection coordination scheme based on OC principle and time dependent characteristics of current to prevent high fault clearing times and maximizing DG connection to MV distribution networks is presented in [33]. This strategy provides extra benefit of running extensive radial networks with directly-coupled DGs (DDGs) or closed-loop networks with converter-based DGs (C-DGs).…”
Section: The Protection Schemes For Only Grid-connected Modementioning
confidence: 99%
“…A protection coordination scheme based on OC principle and time dependent characteristics of current to prevent high fault clearing times and maximizing DG connection to MV distribution networks is presented in [33]. This strategy provides extra benefit of running extensive radial networks with directly-coupled DGs (DDGs) or closed-loop networks with converter-based DGs (C-DGs).…”
Section: The Protection Schemes For Only Grid-connected Modementioning
confidence: 99%
“…Ho wever, the prime limitation of this method is that it cannot handle many fault current redistributions at a time. After that, Jager et al [8] suggested a coordination method for ring and radial d istribution network containing DG. But the above scheme suffers with the problem of sympathy trips depending upon the location and level of fau lt [9].…”
Section: Figure 2 Effect Of Insertion Of Dg On Relay-relay Coordinationmentioning
confidence: 99%
“…Taking in account that it was assumed a fixed value for the pickup current of the relays (160 A), the time multiplier setting is the critical variable to be calculated, according to (2), where (2)…”
Section: A Directional Earth-fault Overcurrent Protectionmentioning
confidence: 99%