2016
DOI: 10.1016/j.proeng.2016.07.283
|View full text |Cite
|
Sign up to set email alerts
|

New Method of Surface Settlement Prediction for Saint-petersburg Metro Escalator Tunnels Excavated by EPB TBM

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 12 publications
(7 citation statements)
references
References 1 publication
0
7
0
Order By: Relevance
“…Sci. 2017, 7, x 7 of 29 (5) When the strength of the middle floor slabs and side walls of the station hall reach up to 80% of the design values, the soil from the middle span to the bottom slab is excavated. Followed by the construction of the waterproof layer and the bottom slab ( Figure 6e).…”
Section: Engineering Overviewmentioning
confidence: 99%
See 4 more Smart Citations
“…Sci. 2017, 7, x 7 of 29 (5) When the strength of the middle floor slabs and side walls of the station hall reach up to 80% of the design values, the soil from the middle span to the bottom slab is excavated. Followed by the construction of the waterproof layer and the bottom slab ( Figure 6e).…”
Section: Engineering Overviewmentioning
confidence: 99%
“…Not only can it ensure the whole stiffness of STS structure, but also retain the characteristics of STS structure. Considering the longitudinal direction of STS structure has a high stiffness, the longitudinal stiffness of material 1 is equivalent to longitudinal stiffness of concrete filled steel tube, and the stiffness is 92 GPa according to Formula (5). Considering the effect of the steel tube with the hole on the whole stiffness, the stiffness was reduced to 70%, that is 65 GPa [35].…”
Section: Simplification Of Sts Structurementioning
confidence: 99%
See 3 more Smart Citations