2015
DOI: 10.7307/ptt.v27i4.1701
|View full text |Cite
|
Sign up to set email alerts
|

New Graphical Approach to Railway Infrastructure Capacity Analysis

Abstract: ABSTRACT

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
29
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 30 publications
(29 citation statements)
references
References 2 publications
0
29
0
Order By: Relevance
“…Example of the graphical compression of train paths according to the UIC methodology on the train traffic diagram [4] The key question is how to estimate the occupation time. Average occupation times per train in principle consist of the travel time in the boundary section and the operation interval time [4].…”
Section: Figurementioning
confidence: 99%
See 3 more Smart Citations
“…Example of the graphical compression of train paths according to the UIC methodology on the train traffic diagram [4] The key question is how to estimate the occupation time. Average occupation times per train in principle consist of the travel time in the boundary section and the operation interval time [4].…”
Section: Figurementioning
confidence: 99%
“…Average occupation times per train in principle consist of the travel time in the boundary section and the operation interval time [4]. Depending on collision points, the operating intervals are divided into station intervals and track intervals [2].…”
Section: Figurementioning
confidence: 99%
See 2 more Smart Citations
“…For successful use of this transport, the railways to meet the following conditions: improved responsibility, optimized network of intermodal terminals and flexible reaction of carriers to customer's requirements. When railway transport is able to connect to the intermodal transport mode effectively, then it is possible to move transport volume of goods from road to railway [1,2,4].…”
Section: Railway Transportmentioning
confidence: 99%