2017
DOI: 10.15866/irecap.v7i1.11021
|View full text |Cite
|
Sign up to set email alerts
|

New Combined Downlink Scheduling Algorithm for LTE Networks

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
3
3
1

Relationship

2
5

Authors

Journals

citations
Cited by 10 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…The PF scheduler is proposed to achieve a balance between fairness and spectral efficiency among different users, while a minimum bit rate is guaranteed. The metric of this algorithm can be expressed as the ratio between the instantaneous flow rate available for the i-th stream in the j-th subchannel ( , ) and the average data rate of the past transmission ( ( − 1)) [33]. Equation ( 5) presents the metric computation following the PF approach.…”
Section: Proportional Fair (Pf)mentioning
confidence: 99%
“…The PF scheduler is proposed to achieve a balance between fairness and spectral efficiency among different users, while a minimum bit rate is guaranteed. The metric of this algorithm can be expressed as the ratio between the instantaneous flow rate available for the i-th stream in the j-th subchannel ( , ) and the average data rate of the past transmission ( ( − 1)) [33]. Equation ( 5) presents the metric computation following the PF approach.…”
Section: Proportional Fair (Pf)mentioning
confidence: 99%
“…A widely known simulator, which is commonly used in much researches, [29][30][31][32][33][34][35][36][37][38][39][40] is utilized to evaluate the performance of the proposed queue-optimized scheduler. The simulator is known as an LTE simulator, 53 and it is utilized to compare the performance of the most recent and efficient schedulers with the proposed queue-optimized scheduler.…”
Section: Simulator Setupmentioning
confidence: 99%
“…A combined scheduling scheme was proposed in Angri et al 32 It is designed by combining the metrics of more than one scheduler in order to gain the advantages of each scheduling technique. Another version of a combined scheduling scheme was proposed in Angri et al 33 It is designed for high mobility and dense area scenarios in order to satisfy the QoS requirements of RT applications.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The channel quality plays an essential role while allocating RBs to UEs . By combining more than one scheduler in one algorithm, the authors in Angri et al tried to benefit from the advantages of each scheme and design a combined scheduling algorithm. They concluded that there is a suitable scheduler for each type of traffic.…”
Section: Related Workmentioning
confidence: 99%