2021
DOI: 10.23919/jsee.2021.000053
|View full text |Cite
|
Sign up to set email alerts
|

New approach for uncertain random multi-objective programming problems based on CESD criterion

Abstract: To overcome the defects that the traditional approach for multi-objective programming under uncertain random environment (URMOP) neglects the randomness and uncertainty of the problem and the volatility of the results, a new approach is proposed based on expected value-standard deviation value criterion (C ESD criterion). Firstly, the effective solution to the URMOP problem is defined; then, by applying sequence relationship between the uncertain random variables, the UR-MOP problem is transformed into a singl… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
0
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 11 publications
0
0
0
Order By: Relevance
“…Different from the proportional dot product method, the dimension d is divided into h equal parts, d/h = dv = dk, and the multi-head attention mechanism calculates Equation (6)…”
Section: Temporal Attention Mechanismmentioning
confidence: 99%
See 1 more Smart Citation
“…Different from the proportional dot product method, the dimension d is divided into h equal parts, d/h = dv = dk, and the multi-head attention mechanism calculates Equation (6)…”
Section: Temporal Attention Mechanismmentioning
confidence: 99%
“…Traditional scenario analysis methods, such as Markov chain [5] and scenario tree [6], are based on statistical assumptions of a specific probability density function. However, it is difficult for deterministic hypothetical probabilistic models to fully characterize the characteristics of renewable energy output [7].…”
Section: Introductionmentioning
confidence: 99%