heating, up to a 13.7% increase in methane production was predicted.Engineering considerations (spacing, financial impact, and effect on gas production) for implementing a vertical HES in a landfill were investigated.Spacing requirements between the wells were dependent on maximum temperature differences in the landfill. Spacing requirements of 12, 12, 16, and 22 m are recommended for waste heating, winter-only HES operation, maximum temperature differences in the landfill less than 17°C, and maximum temperature differences in the landfill greater than 17°C, respectively. A financial analysis