1994
DOI: 10.1007/bf02574759
|View full text |Cite
|
Sign up to set email alerts
|

Network planning under uncertainty with an application to hydropower generation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

1995
1995
2001
2001

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 8 publications
(8 citation statements)
references
References 13 publications
0
8
0
Order By: Relevance
“…In this case, the system Ax = b can be written as There exists a broad range of application fields for stage programs of this form, such as electricity water gas distribution, financial planning, exchange rate management with currency arbitrage, production planning, input-output tables in macroeconomic analysis, design and operation of communications networks, road networks, etc. See [1,2,6,13,17,18,21,22,24,27,33,34,36,42,[47][48][49][50], among others. In many…”
Section: Model Descriptionmentioning
confidence: 99%
See 3 more Smart Citations
“…In this case, the system Ax = b can be written as There exists a broad range of application fields for stage programs of this form, such as electricity water gas distribution, financial planning, exchange rate management with currency arbitrage, production planning, input-output tables in macroeconomic analysis, design and operation of communications networks, road networks, etc. See [1,2,6,13,17,18,21,22,24,27,33,34,36,42,[47][48][49][50], among others. In many…”
Section: Model Descriptionmentioning
confidence: 99%
“…One way to deal with the uncertainty is to obtain the solution x that best tracks each of the scenarios, while attempting to satisfy the constraints for each scenario. This can be achieved by obtaining a solution that minimizes the weighted sum or the largest of the upper differences between the proposed solution value and the optimal solution value for each scenario, see [1,2,13,26,32]. The resulting model does not increase the number of variables of the original formulation, but now there are m|S| constraints.…”
Section: Uncertaintymentioning
confidence: 99%
See 2 more Smart Citations
“…This is being applied in many others fields involving optimization under uncertainty.Álvarez et al [2] use a scenario framework to characterize the uncertainty on the right-hand side (rhs), minimizing the regret of wrong decisions and forming implementable policies. Also, Berman, Ganz, and Wagner [4] introduce a scenario-modeling approach for capacity-expansion planning in the service industry.…”
Section: Introductionmentioning
confidence: 99%