2017
DOI: 10.5539/ass.v14n1p1
|View full text |Cite
|
Sign up to set email alerts
|

Multivariate Statistical Quality Control Based on Ranked Set Sampling

Abstract: The sample of the study was formed using simple random sampling, ranked set sampling, extreme ranked set sampling and median ranked set sampling. At the end of this process, the researcher created Hotelling's T 2 control charts, a multivariate statistical process control method. The performances of SRS, RSS, ERSS and MRSS sampling methods were compared to one another using these control charts. A simulation was performed to see the average run-length values for Hotelling's T 2 control charts, and these finding… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
3
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 13 publications
0
3
0
Order By: Relevance
“…Ayrıca örnek hacmini artırmadan ana kütle parametresi ile tahmin edici arasındaki sapmanın azalacağından bahsetmiştir. Bu bağlamda örnek hacminin farklı örnekleme yöntemleriyle de araştırıldığında örnek hacminin belli bir sayıdan sonra anakütle parametresi ile tahmin edici arasındaki sapmanın azalacağı belirlenmiştir [32]. [33]; tahmin edicinin, parametre için doğru bilgi taşıyıp taşımadığına cevap aramak üzere, standart sapmanın bootstrap tahminini ele almışlardır.…”
Section: Tartışma Ve Sonuçunclassified
“…Ayrıca örnek hacmini artırmadan ana kütle parametresi ile tahmin edici arasındaki sapmanın azalacağından bahsetmiştir. Bu bağlamda örnek hacminin farklı örnekleme yöntemleriyle de araştırıldığında örnek hacminin belli bir sayıdan sonra anakütle parametresi ile tahmin edici arasındaki sapmanın azalacağı belirlenmiştir [32]. [33]; tahmin edicinin, parametre için doğru bilgi taşıyıp taşımadığına cevap aramak üzere, standart sapmanın bootstrap tahminini ele almışlardır.…”
Section: Tartışma Ve Sonuçunclassified
“…Eygü and Özçomak (2017) initiated the multivariate control chart procedure for ranked set schemes. Later, Mehmood et al (2019) suggested the Hotelling T 2 control chart under BVRST with the classical runs rule.…”
Section: Introductionmentioning
confidence: 99%
“…Their results revealed that the Hotelling T 2 control chart under BVRST has extraordinary performance relative to the existing control chart under SRS (Hotelling, 1947). Since the studies by Eygü and Özçomak (2017) and Mehmood et al (2019) are dependent on the classical runs rule, they cannot be considered effective for detection of small and moderate shifts. The disadvantage of the classical runs rule with theoretical justification is described above in detail.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation