Multivariate Linear Regression and CART Regression Analysis of TBM Performance at Abu Hamour Phase-I Tunnel

Abstract: The first phase of the Abu Hamour drainage and storm tunnel was completed in early 2017. The 9.5 km long, 3.7 m diameter tunnel was excavated with two Earth Pressure Balance (EPB) Tunnel Boring Machines from Herrenknecht. TBM operation processes were monitored and recorded by Data Acquisition and Evaluation System. The authors coupled collected TBM drive data with available information on rock mass properties, cleansed, completed with secondary variables and aggregated by weeks and shifts. Correlations and des… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 10 publications
(4 citation statements)
references
References 15 publications
0
4
0
Order By: Relevance
“…Multivariate regression is a statistical method, which is used to find out the relationship between dependent and independent variables, as well as for data analysis in modeling. It allows predicting the dependent variable from the independent variables and their relationship (Jakubowski & Tajduś, 2014;Enayatollahi et al, 2014;Esmaeili et al, 2014;Jakubowski et al, 2017). Given 146 blastings recorded in the studied six limestone mines, 80% of the data were utilized for modeling while the other 20% were randomly used to test the model.…”
Section: Modeling With Multivariate Regressionmentioning
confidence: 99%
“…Multivariate regression is a statistical method, which is used to find out the relationship between dependent and independent variables, as well as for data analysis in modeling. It allows predicting the dependent variable from the independent variables and their relationship (Jakubowski & Tajduś, 2014;Enayatollahi et al, 2014;Esmaeili et al, 2014;Jakubowski et al, 2017). Given 146 blastings recorded in the studied six limestone mines, 80% of the data were utilized for modeling while the other 20% were randomly used to test the model.…”
Section: Modeling With Multivariate Regressionmentioning
confidence: 99%
“…At the same time, in the field of engineering, the CART is mainly used in equipment improvements and analysis of geotechnical engineering characteristics. In engineering construction, CART could be combined with multiple regression, monitoring and recording the operation process of TBM (tunnel boring machine) and evaluation system [13], which could evaluate important problems of dam operation. Design and safety are evaluated for dam structure in the estimation of dam storage capacity [14].…”
Section: Introductionmentioning
confidence: 99%
“…Salimi et al [21] developed a model for TBM performance prediction by regression technique. Jakubowski et al [22] proposed a new model for the tunnel boring machine performance by multivariate linear regression technique. Liu et al [23] presented a model for TBM performance prediction using a rock mass classification system.…”
Section: Introductionmentioning
confidence: 99%