Remote Sensing Technologies and Applications in Urban Environments VII 2022
DOI: 10.1117/12.2634711
|View full text |Cite
|
Sign up to set email alerts
|

Multisource-data-fusion for the digitization of critical infrastructural elements

Abstract: Due to the relatively high average age of the rail infrastructure in Germany and the thus often historic plans, as-built documentation has a very high priority at Deutsche Bahn AG. The inventory and updating of existing plans represent an enormous challenge for the operator, DB Netz AG. More than 4.6 million inventory plans must be continuously checked to ensure that they are up to date,correct,adjusted and supplemented as necessary. The most fragile structures are railroad bridges. These are the focus of this… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2
1
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(5 citation statements)
references
References 4 publications
(5 reference statements)
0
5
0
Order By: Relevance
“…In recent years, the establishment of BIM in the construction sector has intensified [9]. In this course, unified structures and requirements have been established.…”
Section: Related Workmentioning
confidence: 99%
See 1 more Smart Citation
“…In recent years, the establishment of BIM in the construction sector has intensified [9]. In this course, unified structures and requirements have been established.…”
Section: Related Workmentioning
confidence: 99%
“…At the same time, a future service life of more than 100 years is targeted for the bridges [7,8]. In order to achieve this goal and to establish a predictive maintenance management for existing bridges, it is necessary to use new digital methods and technologies [9,10].…”
Section: Introductionmentioning
confidence: 99%
“…Afterwards, in the third phase (Phase 03: geometric transformation), the master point cloud is transformed by the surveyor into a digital 3D model. This process step can be performed manually [25,26] or with the support of intelligent algorithms [7,8,27]. Parallel to this, the fourth phase (phase 04: as-built data analysis and semantization) first focuses on the acquisition and analysis of as-built documents.…”
Section: General Process Of the Model Generationmentioning
confidence: 99%
“…This can be guaranteed by the use of digital building models using the Building Information Modeling (BIM) method as a basis [6]. The creation process of the digital models is performed manually with many sub-processes and is resource-intensive [7]. In addition, many different user groups are involved and there is a high degree of interaction [7,8].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation