2016
DOI: 10.1061/(asce)me.1943-5479.0000374
|View full text |Cite
|
Sign up to set email alerts
|

Multiobjective Construction Schedule Optimization Using Modified Niched Pareto Genetic Algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
14
0
1

Year Published

2016
2016
2022
2022

Publication Types

Select...
8
1
1

Relationship

0
10

Authors

Journals

citations
Cited by 34 publications
(17 citation statements)
references
References 16 publications
0
14
0
1
Order By: Relevance
“…Kim et al [35] used NPGA to optimize cost, time and resource utilization. They optimized the three objectives at the same time.…”
Section: Niched Pareto Genetic Algorithm (Npga)mentioning
confidence: 99%
“…Kim et al [35] used NPGA to optimize cost, time and resource utilization. They optimized the three objectives at the same time.…”
Section: Niched Pareto Genetic Algorithm (Npga)mentioning
confidence: 99%
“…As we all know, the four indicators, such as quality, duration, cost and safety management are of great significance to maximize the interests of enterprises. These four critical indicators of construction projects are highly correlated and contradictory, but the engineering projects must meet these conflicting project objectives at the same time [1][2][3][4].…”
Section: Introductionmentioning
confidence: 99%
“…Many previous studies have attempted to find solutions to facilitate multiobjective optimization, such as minimization of construction duration, cost, and resource fluctuation [4,5]. Meanwhile, various methods have been introduced to optimize construction scheduling while considering constraints such as the workforce, resource availability, or construction site layout that have been considered in earlier studies [6][7][8].…”
Section: Introductionmentioning
confidence: 99%