2018
DOI: 10.1007/978-3-319-89920-6_44
|View full text |Cite
|
Sign up to set email alerts
|

Multi-routing for Transport-Matching in Cooperative, Full Truckload, Relay Networks

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2018
2018
2018
2018

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…The resulting problem is called the multiroute CTN relay problem (MR-CTNRP). Detailed information concerning the business process and the data handling can be read in two other contributions to this volume [4,5] and the thesis [6].…”
Section: Cooperative Truck Networkmentioning
confidence: 99%
See 1 more Smart Citation
“…The resulting problem is called the multiroute CTN relay problem (MR-CTNRP). Detailed information concerning the business process and the data handling can be read in two other contributions to this volume [4,5] and the thesis [6].…”
Section: Cooperative Truck Networkmentioning
confidence: 99%
“…We optimize in the objective function (1) one of the measurement variables u or v. Restrictions (2) and (3) compute these values from the independent variables. Restrictions (4) and (5) ensure that a path can be selected if and only all of its morning links and all of its afternoon links have been assigned to the appropriate part of some depot commute. Restrictions (6) and 7guarantee that for each depot commute the number of paths assigned to the leaving part of the commute equals the number of paths assigned to the returning part.…”
Section: A Mixed-integer Linear Programming Modelmentioning
confidence: 99%