2020
DOI: 10.1088/1757-899x/814/1/012015
|View full text |Cite
|
Sign up to set email alerts
|

Multi response optimization in WEDM of H13 steel using hybrid optimization approach

Abstract: Surface roughness and material removal rate (MRR) are important technological parameters which describe quality of machined surfaces and productivity of machining process. Surface roughness and MRR are significantly influenced by many interactive process parameters dynamically but those are difficult to quantify adequately in any machining process. Wire electrical discharge machining (WEDM) is one of the advanced machining processes which used thin wire as cutting tool for creating intricate features on machin… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 9 publications
0
2
0
Order By: Relevance
“…However, an elevated value of electric discharge may induce the breaking of wire. (11) • Pulse-off-Time (T OFF ): the time between discharges, referred to as the pulse interval or pulse off time, is measured in microseconds. This duration signifies the interval between successive discharges.…”
Section: Components Of Wedmmentioning
confidence: 99%
“…However, an elevated value of electric discharge may induce the breaking of wire. (11) • Pulse-off-Time (T OFF ): the time between discharges, referred to as the pulse interval or pulse off time, is measured in microseconds. This duration signifies the interval between successive discharges.…”
Section: Components Of Wedmmentioning
confidence: 99%
“…Generally, multiple responses must be considered to achieve an overall process improvement is important to note that an optimization process does not necessarily imply the determination of optimal operating conditions, since it is practically impossible to establish the optimal point due to the large number of variables that impact a process. Instead, what can be determined are conditions for improvement from the selection of maximum points determined within a predetermined search space (Alketbi et al, 2022;Ding et al, 2020;Laidani et al, 2020;Rathod et al, 2020).…”
Section: Theoretical Referentialmentioning
confidence: 99%
“…It is important to note that an optimization process does not necessarily imply the determination of optimal operating conditions since it is practically impossible to establish the optimal point due to the large number of variables that impact a process. Instead, what can be determined are the improvement conditions from the selection of maximum points determined within a predetermined search space (Alketbi et al, 2022;Ding et al, 2020;Laidani et al, 2020;Rathod et al, 2020).…”
Section: Theoretical Referentialmentioning
confidence: 99%