DOI: 10.25148/etd.fidc001982
|View full text |Cite
|
Sign up to set email alerts
|

Multi-resolution Modeling of Dynamic Signal Control on Urban Streets

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…It happens that both incidents occur about 1,000 ft away from the upstream intersection (Northeast 3rd Ave and Broward Boulevard) and 400 ft away from the downstream intersection (US-1 and Broward Boulevard). As stated earlier, the regression models developed by Massahi et al (3,21) (Table 2) were used to confirm the maximum saturation flow rate and capacities of links upstream of the incident. The volumes produced from the DTA models for the two case study incident scenarios were imported to the microscopic simulation tool VISSIM to evaluate the impact of the new signal timing plans on the network performance.…”
Section: New Signal Timing Planmentioning
confidence: 99%
See 2 more Smart Citations
“…It happens that both incidents occur about 1,000 ft away from the upstream intersection (Northeast 3rd Ave and Broward Boulevard) and 400 ft away from the downstream intersection (US-1 and Broward Boulevard). As stated earlier, the regression models developed by Massahi et al (3,21) (Table 2) were used to confirm the maximum saturation flow rate and capacities of links upstream of the incident. The volumes produced from the DTA models for the two case study incident scenarios were imported to the microscopic simulation tool VISSIM to evaluate the impact of the new signal timing plans on the network performance.…”
Section: New Signal Timing Planmentioning
confidence: 99%
“…The capacity at the incident location was estimated using the models developed by Massahiet al ( 3 , 21 ). This capacity can be used as an input to the model to determine with greater accuracy the impact of the midblock incident on maximum throughput of the upstream intersection.…”
Section: Mrmmentioning
confidence: 99%
See 1 more Smart Citation