Multi-period resource allocation for estimating project costs in competitive bidding

Abstract: In competitive bidding for project contracts, contractors estimate the cost of completing a project and then determine the bid price. Accordingly, the bid price is markedly affected by the inaccuracies in the estimated cost. To establish a profitmaking strategy in competitive bidding, it is crucial for contractors to estimate project costs accurately. Although allocating a large amount of resources to cost estimates allows contractors to prepare more accurate estimates, there is usually a limit to available re… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 12 publications
(5 citation statements)
references
References 32 publications
0
5
0
Order By: Relevance
“…The DEA method was then formulated. Over the years, the method has been widely applied in various fields to calculate both the technical and economic efficiency of the functioning of enterprises as complex systems [56][57][58][59].…”
Section: Basic Conceptsmentioning
confidence: 99%
See 1 more Smart Citation
“…The DEA method was then formulated. Over the years, the method has been widely applied in various fields to calculate both the technical and economic efficiency of the functioning of enterprises as complex systems [56][57][58][59].…”
Section: Basic Conceptsmentioning
confidence: 99%
“…This model does not have an input or output orientation. The ADD function of the model determines the efficiency identified from the reserve variables [59].…”
Section: Related Workmentioning
confidence: 99%
“…The researches of Takano et al [16] are devoted to one of the directions of resource allocation in complex systems. Shao et al [17] also suggest applying the DEA method to evaluate the effectiveness of a grid of branches in a large enterprise with a centralized management structure.…”
Section: Problem Formulationmentioning
confidence: 99%
“…Contractor organisations often take part in competitive tendering, and the profitability of their bids is governed by their bidding strategies (Takano et al , 2017). The term “construction competition” refers to competitive tendering undertaken by competing contractor organisations with profit maximisation as their prime goal (Reinschmidt and Kim, 2006).…”
Section: Introductionmentioning
confidence: 99%