2013
DOI: 10.2478/lpts-2013-0033
|View full text |Cite
|
Sign up to set email alerts
|

Multi-Objective Optimization of Transmission Lines / Elektropārvades Līnijas Daudzkriteriālā Optimizācija

Abstract: Introduction of new advanced electrical connections into a transmission grid reduces the capacity of existing overhead lines (OHLs). At the same time, designing & building of new OHLs and substations involves considerable technical, environmental and economical problems. The authors propose a concept of the multi-objective optimization for selection of transmission line routes, towers (their type, placement and geometry), of conductors, insulators, dampers, earthing and lightning protection systems, span l… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 10 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?