Abstract: The combined cooling, heating and power (CCHP) system not only has high energy efficiency but also has different load structures. Traditional separate production (SP) system and power supply system do not consider the land cost in terms of the environmental benefits, and in the aspect of the power supply reliability, the grid-connected inverter cost is also ignored. Considering the deficiency of the traditional energy supply system, this paper builds the CCHP system construction cost model. The particle swarm … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
9
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(10 citation statements)
references
References 25 publications
(25 reference statements)
0
9
0
Order By: Relevance
“…C is the total cost of operating the energy system, M C is the cost of gas turbine production consuming natural gas, BL C is the cost of gas boiler consuming natural gas, NP C is the cost of new energy losses, O C is the cost of purchased electricity, I C is the cost of operation and maintenance of each equipment unit, and IDR C is the cost of integrated demand-side response [4] .…”
Section: The Primary Functionmentioning
confidence: 99%
“…C is the total cost of operating the energy system, M C is the cost of gas turbine production consuming natural gas, BL C is the cost of gas boiler consuming natural gas, NP C is the cost of new energy losses, O C is the cost of purchased electricity, I C is the cost of operation and maintenance of each equipment unit, and IDR C is the cost of integrated demand-side response [4] .…”
Section: The Primary Functionmentioning
confidence: 99%
“…The design of the system can be adapted in order to optimize different objective functions. Their study shows that this system is capable of reducing total investment costs, increasing environmental benefits, and increasing system reliability [5]. In terms of operational optimization of CCHP systems, Xu et al proposed a staged optimization strategy designed to help with scheduling of the system.…”
Section: Multi-generation and District Energy Systemsmentioning
confidence: 99%
“…PSO [29] is a kind of swarm intelligence optimization algorithm, which imitates the birds' foraging. It has been widely used in various applications, such as controller design [30], [31], optimal scheduling [32], [33], to name a few.…”
Section: B Particle Swarm Optimizationmentioning
confidence: 99%
“…In order to verify the improvement of PSO on the optimization of NCMD parameters, a synthesized signal (29) is tested as the subject. s = cos (2πt) + cos (10πt) + 2 cos(16πt + 40πt 2 ) + η (29) where η ∈ N (0, 0.1) is noise. The PSO settings are as follows: the maximum iteration number and particle number are 20 and 30, respectively.…”
Section: Simulationsmentioning
confidence: 99%
See 1 more Smart Citation