2018
DOI: 10.1080/0305215x.2018.1547716
|View full text |Cite
|
Sign up to set email alerts
|

Multi-objective model for optimizing railway infrastructure asset renewal

Abstract: Multiobjective model for optimizing railway infrastructure asset renewal A multiobjective model for managing railway infrastructure asset renewal is presented. The model aims at optimizing three objectives, while respecting operational constraints: leveling investment throughout multiple years, minimizing total cost, minimizing work start postponements. Its output is an optimized intervention schedule. The model is based on a case-study from a Portuguese infrastructure management company, who specified the obj… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 46 publications
(38 reference statements)
0
1
0
Order By: Relevance
“…Rail maintenance scheduling is a broad field where different types of problems are considered. First, the temporal granularity varies, from short to medium term maintenance planning to longer term where strategic and investment decisions are relevant (Simson et al., 2000; Sousa et al., 2019). Second, the geographic granularity varies, from taking into account individual tracks and switches to looking at a higher level network of, for example, an entire city.…”
Section: Related Workmentioning
confidence: 99%
“…Rail maintenance scheduling is a broad field where different types of problems are considered. First, the temporal granularity varies, from short to medium term maintenance planning to longer term where strategic and investment decisions are relevant (Simson et al., 2000; Sousa et al., 2019). Second, the geographic granularity varies, from taking into account individual tracks and switches to looking at a higher level network of, for example, an entire city.…”
Section: Related Workmentioning
confidence: 99%