Multi-objective feeder reconfiguration by distribution management system

Abstract: system is determined as stage, this solution is by numerical examples. tial benefits since the The problem of optimal feeder rec problem concerned urban distribution occurs on both se infrasmcture stems each distribulocated at the transserved. The problem Id be opened by two urban and rural distribution systems. is mostly underground cable systems works but operated as radial feeders. open/closed status of sectionali former site determines how the as that of finding Utah, May 7-12. 1995.ing switches is not as … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
23
0

Year Published

2006
2006
2019
2019

Publication Types

Select...
7
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 96 publications
(23 citation statements)
references
References 12 publications
0
23
0
Order By: Relevance
“…To ensure radial topology in which every load is connected to a single substation, one of the neighboring currently closed sectionalizing switches needs to open (say S3), and loads on bus N2 will be transferred from Feeder1 to Feeder2. This two-step operation is known as branch exchange method [27]. New status of switch pair S2-S3 changes the network topology and new power flow calculations are needed to calculate objective function for changed network configuration.In case of more than one tie switch, same procedure needs to be repeated forall other initially open switches to ensure that the optimal solution is found.…”
Section: Methods Takes One Of the Ios And Closes It (Say Switch S2)mentioning
confidence: 99%
“…To ensure radial topology in which every load is connected to a single substation, one of the neighboring currently closed sectionalizing switches needs to open (say S3), and loads on bus N2 will be transferred from Feeder1 to Feeder2. This two-step operation is known as branch exchange method [27]. New status of switch pair S2-S3 changes the network topology and new power flow calculations are needed to calculate objective function for changed network configuration.In case of more than one tie switch, same procedure needs to be repeated forall other initially open switches to ensure that the optimal solution is found.…”
Section: Methods Takes One Of the Ios And Closes It (Say Switch S2)mentioning
confidence: 99%
“…• Minimization of power losses: DMS network operation implemented in the Optimal Network Reconfiguration may provide minimization of power losses [3][4][5]. Besides, improve voltage quality DMS Volt/Var and reduce losses as well [6][7][8], as well as Energy Audit implies tracing and reducing non-technical losses.…”
Section: Benefits Of Dasmentioning
confidence: 99%
“…A.3.5.1.12 Multi-objective feeder reconfiguration by distribution manager system [76] Summary: This paper proposes a two-stage method for load reconfiguration with a multiple objective function. The multi objectives considered are minimization of power loss, balancing of transformer load, minimization of worst voltage drop, minimization of service interruption, and balancing of service for important customers.…”