2020
DOI: 10.2507/ijsimm19-3-co12
|View full text |Cite
|
Sign up to set email alerts
|

Multi-Objective Energy-Saving Job-Shop Scheduling Based on Improved NSGA-II

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
12
0
2

Year Published

2021
2021
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 14 publications
(14 citation statements)
references
References 24 publications
0
12
0
2
Order By: Relevance
“…When children are in the process of growth, the cultivation of balance ability is conducive to children's perception of uprightness, direction, and distance, which lays the foundation for children's spatial perception. Children's balance dysfunction can lead to unsteady standing, sitting still, restless, falling easily, and insecure, which seriously affects their interpersonal relationships and also affects their study and work, reducing their quality of life [18][19][20]. Many special children have body balance disorders.…”
Section: Role Of Education Cloud Integration In the Evaluation Ofmentioning
confidence: 99%
“…When children are in the process of growth, the cultivation of balance ability is conducive to children's perception of uprightness, direction, and distance, which lays the foundation for children's spatial perception. Children's balance dysfunction can lead to unsteady standing, sitting still, restless, falling easily, and insecure, which seriously affects their interpersonal relationships and also affects their study and work, reducing their quality of life [18][19][20]. Many special children have body balance disorders.…”
Section: Role Of Education Cloud Integration In the Evaluation Ofmentioning
confidence: 99%
“…Equations ( 1) and ( 2) are the objective functions. Equations ( 3), ( 4), ( 5) and ( 6) are four energy consumption expressions; constraint (7) specifies the range of the makespan. Constraints ( 8), ( 9) and (10) indicate that at any stage, each job has one and only one immediate front job (including the virtual job J0), at most one immediate back job, and they cannot be identical.…”
Section: A Problem Descriptionmentioning
confidence: 99%
“…Lu et al [6] constructed a mathematical model aiming at minimizing the makespan and energy consumption, mainly considering the influence of controllable operation times on the scheduling scheme. The work in [7] studied the job shop scheduling problem with the objective of minimizing the makespan, total carbon emission and total delay time, and designed the NSGA-II algorithm to solve the problem. Luo et al [8] proposed an ant colony algorithm to solve the distributed flow shop scheduling problem under time-of-use price.…”
Section: Introductionmentioning
confidence: 99%
“…e growing market demand for green products brings about multifaceted challenges and pressures to green producers and sellers: expediting the delivery, reducing the cost, improving the quality, and ensuring the timeliness of distribution [1][2][3][4][5]. It is impossible to cope with these through the resource optimization and integration by a single producer or seller.…”
Section: Introductionmentioning
confidence: 99%
“…Under the rapid changes of the market, brand-new supply chain management ideas are needed to deliver satisfactory products to consumers at minimum cost and fastest speed from the angle of green supply chain management and construct a logistics network based on supply chain. (2) In the management environment of green supply chain, the optimization of logistics network usually focuses on the logistics facility sites and distribution paths. It is particularly important to build a suitable optimization model.…”
Section: Introductionmentioning
confidence: 99%