2018
DOI: 10.1016/j.jclepro.2018.02.224
|View full text |Cite
|
Sign up to set email alerts
|

Multi-object optimization of flexible flow shop scheduling with batch process — Consideration total electricity consumption and material wastage

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
28
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 73 publications
(28 citation statements)
references
References 29 publications
0
28
0
Order By: Relevance
“…Lastly, the scheduling problems which is the most discussed category of MOCOPs consists of open shop scheduling problem [125], [126], job shop scheduling problem (JSSP) [127], [128], [129], [130], [131], [132], FSP [133], [134], [135], [136], [137], [138], project scheduling problem (PSP) [139], resource constrained PSP (RCPSP) [140], [141], [142], [143], [144], [145], timetabling problem [146], cross-docking scheduling problem [147], task scheduling problem [148], [149], [150], [151], [152], [153], [154], machine scheduling problem [155], [156], [157], [158], [159], [160], [161], satellite range scheduling problem [162], multi-objective satellite data transmission scheduling problem [163], satellite scheduling of large areal tasks [164], operating room scheduling [165], [166], harvest scheduling problem [167], energy-efficiency scheduling problem…”
Section: A Nsga-ii For Mocopsmentioning
confidence: 99%
See 2 more Smart Citations
“…Lastly, the scheduling problems which is the most discussed category of MOCOPs consists of open shop scheduling problem [125], [126], job shop scheduling problem (JSSP) [127], [128], [129], [130], [131], [132], FSP [133], [134], [135], [136], [137], [138], project scheduling problem (PSP) [139], resource constrained PSP (RCPSP) [140], [141], [142], [143], [144], [145], timetabling problem [146], cross-docking scheduling problem [147], task scheduling problem [148], [149], [150], [151], [152], [153], [154], machine scheduling problem [155], [156], [157], [158], [159], [160], [161], satellite range scheduling problem [162], multi-objective satellite data transmission scheduling problem [163], satellite scheduling of large areal tasks [164], operating room scheduling [165], [166], harvest scheduling problem [167], energy-efficiency scheduling problem…”
Section: A Nsga-ii For Mocopsmentioning
confidence: 99%
“…The improved NSGA-II outperformed the conventional NSGA-II and SPEA-II algorithms. Zeng et al [135] proposed a hybrid algorithm integrating NSGA-II with tabu search and a job merging strategy for a multi-objective flexible batch processing FSP in manufacturing industries. For multiobjective permutation FSP, Chiang et al [134] developed an efficient algorithm combining NSGA-II with a problemspecific local search procedure NEH and several adaptations, including acceptance criterion and ordering strategy.…”
Section: E) Scheduling Problemmentioning
confidence: 99%
See 1 more Smart Citation
“…Liu, et al [22] proposed a hybrid fruit fly algorithm for solving flexible job-shop to maximize carbon footprint. Zeng, et al [23] proposed the NSGA II algorithm to minimize energy consumption. Tang, et al [24] proposed the PSO algorithm to minimize carbon emissions.…”
Section: Nomenclature and Problem Definitionmentioning
confidence: 99%
“…For the batch scheduling, Adekola et al (2013) and Capón-García et al (2011) studied the production process of acrylic fibers, with profit and productivity as economic indicators and electricity and water consumption as green indicators. Zeng et al (2018) established a multi-objective optimization mathematical model for the special batch scheduling existing in flow shop scheduling. The optimization objectives include power consumption, material consumption and completion time.…”
Section: Introductionmentioning
confidence: 99%