2019
DOI: 10.32983/2222-4459-2019-2-333-339
|View full text |Cite
|
Sign up to set email alerts
|

Multi-Criteriality as a Factor of Project Risk

Abstract: ЕКОНОМІКА МЕНЕДЖМЕНТ І МАРКЕТИНГ 333 БІЗНЕСІНФОРМ № 2 '2019 www.business-inform.net УДК 658:338.28 JEL: D81 ПОЛІКРИТЕРІАЛЬНІСТЬ ЯК ФАКТОР ПРОЕКТНОГО РИЗИКУ 2019 ФЕЩУР Р. В., КІЧОР В. П., ШИШКОВСЬКИЙ С. В., ГУЦУЛЯК В. М. УДК 658:338.28 JEL: D81 Фещур Р. В., Кічор В. П., Шишковський С. В., Гуцуляк В. М. Полікритеріальність як фактор проектного ризику У статті розглянуто проектний ризик як потенційну небезпеку щодо досягнення мети проекту за об'єктивної неможливості оперування повною та достовірною інформацією п… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
5
0

Year Published

2019
2019
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…In particular, a number of scholars describe the methodology for conducting statistical evaluations for economic research (FESHCHUR;BARVINSKYI;KICHOR, 2001), pointing to the importance of studying the factors behind the result. Other scholars (RUSKA, 2012;…”
Section: Literature Reviewmentioning
confidence: 99%
“…In particular, a number of scholars describe the methodology for conducting statistical evaluations for economic research (FESHCHUR;BARVINSKYI;KICHOR, 2001), pointing to the importance of studying the factors behind the result. Other scholars (RUSKA, 2012;…”
Section: Literature Reviewmentioning
confidence: 99%
“…To determine the factors between which there is multicollinearity, t-statistics was used in accordance with (Feshchur, et al, 2003), which involves the construction of the matrix Z, reversed to the correlation (4):…”
mentioning
confidence: 99%
“…Next, for a given confidence probability p and degrees of freedom k=n-m-1, was found the critical value of Student's criterion tcr in the table in accordance with (Feshchur, et al, 2003). It is known that if ] ST ] > сY , then with reliability p it can be argued that there is multicollinearity between the factors xi and xj.…”
mentioning
confidence: 99%
See 2 more Smart Citations