2011
DOI: 10.1177/0954405410397433
|View full text |Cite
|
Sign up to set email alerts
|

Multi-criteria approach to optimization of enterprise production programme

Abstract: This paper develops a multi-criteria model for making decisions on the production programme relevant for industrial enterprises. It presents some possibilities of using the method of multi-criteria decision making with managerial decision making on the production programme and some possibilities of modelling and disclosing preferences of a decision maker when conducting multi-criteria rating of alternative solutions by applying the concept of PROMETHEE method. The development of a multi-criteria basis for mult… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2014
2014
2019
2019

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 21 publications
0
3
0
Order By: Relevance
“…The PROMETHEE method does not provide clear guidelines to the assessment of criteria importance, either, but it is rather left to the decision-makers' rough estimate, and, as such, is imprecise and unreliable. The criteria used in the process of alternatives evaluation are expressed in different measure units with different requirements of minimization or maximization, they are changeable in time, heterogeneous, and frequently contradictory, as well [1,16], whereas their relative significance is a variable category and depends on a concrete situation, as well as on the decision-maker's subjective perceptions. Besides, the significance attributed to criteria determines to a great extent the final selection, so, pursuant to the importance of this problem issue, it is necessary within the MCDM process, that much more complex approaches to the determination of the criteria relative weight than that offered by the PROMETHEE method should be included.…”
Section: A Methodological Frameworkmentioning
confidence: 99%
See 1 more Smart Citation
“…The PROMETHEE method does not provide clear guidelines to the assessment of criteria importance, either, but it is rather left to the decision-makers' rough estimate, and, as such, is imprecise and unreliable. The criteria used in the process of alternatives evaluation are expressed in different measure units with different requirements of minimization or maximization, they are changeable in time, heterogeneous, and frequently contradictory, as well [1,16], whereas their relative significance is a variable category and depends on a concrete situation, as well as on the decision-maker's subjective perceptions. Besides, the significance attributed to criteria determines to a great extent the final selection, so, pursuant to the importance of this problem issue, it is necessary within the MCDM process, that much more complex approaches to the determination of the criteria relative weight than that offered by the PROMETHEE method should be included.…”
Section: A Methodological Frameworkmentioning
confidence: 99%
“…There is a constant increase of product complexity while the lifecycle shortens, also the market fluctuations and economic uncertainty create pressure on prices and expressed need for a quick response to the consumer's growing and interchangeable requirements. All these are the challenges brought by contemporary global flows, which on their part radically change market conditions and competitive relationships, to overcome those challenges requires adoption of the new knowledge and modifying problem reaction and solution approach [1]. To face these challenges, manufacturers must adopt and incorporate the concept of products management process into their business flows throughout their lifecycle, from the idea of "end-of-life", i.e.…”
Section: Introductionmentioning
confidence: 99%
“…A very important factor in the introduction of the ERP system is active and functional communication between all involved in the project implementation ERP system. [34]. Communication itself means a formal progress and information concerning the progress of the project from the leadership of the project to other stakeholders in the organization.…”
Section: Research Of Csf In Implementation Of An Erp System In a Companymentioning
confidence: 99%