SPE Asia Pacific Oil &Amp; Gas Conference and Exhibition 2022
DOI: 10.2118/210741-ms
|View full text |Cite
|
Sign up to set email alerts
|

Moving Rig Time Efficiency to Improve Operations, Reduce Non-Productive Time Rig and Emission Co2 Using on Trailer

Abstract: One of the efforts achieve Key Performance Indicator is to realize efficient organizational performance. Optimizing rig movement management is needed in PT. Pertamina Hulu Indonesia Sangasanga Field by reducing the duration of moving between wells and ensuring that the Rig cycle time kept to minimum. In real condition, all equipment in rig unit is still arranged on its own Skid with a large number of transport loads and in the activity of moving Rig/Hoist equipment between wells, all equipment transported is m… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 2 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?