The platform will undergo maintenance on Sep 14 at about 9:30 AM EST and will be unavailable for approximately 1 hour.
2020
DOI: 10.1002/best.202000081
|View full text |Cite
|
Sign up to set email alerts
|

Monitoring der Gerbergelenke im Erhaltungsprojekt Grenzbrücke Basel

Abstract: Die Überwachung (Monitoring) von Bauwerken kann einen Betrag dazu leisten, Schäden rechtzeitig zu erkennen und mehr Sicherheit für die Nutzer von Infrastrukturbauwerken zu schaffen [1–3]. Dabei ist es sinnvoll, ausgewählte neuralgische Punkte des Tragwerks zu überwachen, um die Datenmenge nicht zu groß werden zu lassen und die Übersichtlichkeit zu erhalten. Sensoren können zusätzliche Informationen über Zustand, Einwirkungen oder Umwelteinflüsse (z. B. Temperaturverformungen) eines Bauwerks zur Verfügung stell… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0
1

Year Published

2021
2021
2022
2022

Publication Types

Select...
3

Relationship

3
0

Authors

Journals

citations
Cited by 3 publications
(7 citation statements)
references
References 4 publications
(4 reference statements)
0
6
0
1
Order By: Relevance
“…The system will be used as extensively as possible to measure long- and short-term effects. The warning system is already installed and can be read about in [ 7 ].…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…The system will be used as extensively as possible to measure long- and short-term effects. The warning system is already installed and can be read about in [ 7 ].…”
Section: Discussionmentioning
confidence: 99%
“…The load introduction from a passing truck into the prestressed steel rods is complicated and almost impossible to recalculate. A simple approach with a truss model was tried in [ 7 ]. In order to obtain a correlation between passing truckloads and the measured strains, reference measurements were conducted.…”
Section: Reference Measurements With Defined Loaded Trucksmentioning
confidence: 99%
See 1 more Smart Citation
“…In order to be able to precisely record the amplitudes of the loads, they must be separated from the long-term influences. A sampling rate of a few tenths of a second is required for precise measurement, which can lead to large amounts of data being stored [7]. This publication describes the problem and an approach to solving it.…”
Section: Introductionmentioning
confidence: 99%
“…Die Erhaltungsmaßnahmen werden durch das Ingenieurbüro Schmidt + Partner Bauingenieure Basel) projektiert (vgl. auch [2]). Bauherr ist das schweizerische Bundesamt für Strassen (ASTRA).…”
Section: Introductionunclassified