2013
DOI: 10.1016/j.apenergy.2012.09.005
|View full text |Cite
|
Sign up to set email alerts
|

Monitoring-based HVAC commissioning of an existing office building for energy efficiency

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
41
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 98 publications
(41 citation statements)
references
References 11 publications
0
41
0
Order By: Relevance
“…It can also support commissioning efforts by providing estimates for potential energy/cost savings that could be achieved by fixing the faults during retro-commissioning. Quantified information on the impacts and priorities of various coexisting operational faults can be provided to the commissioners or the building management system, resulting in more reasonable and reliable commissioning decisions, especially when budget and staff resources are limited [13]. Moreover, modeling operational faults is critical to achieving more reliable energy model calibrations when most energy models for existing buildings assume ideal conditions without any operational problems.…”
Section: Figure 1 Potential Hvac Operational Faults In a Typical Vav mentioning
confidence: 99%
See 1 more Smart Citation
“…It can also support commissioning efforts by providing estimates for potential energy/cost savings that could be achieved by fixing the faults during retro-commissioning. Quantified information on the impacts and priorities of various coexisting operational faults can be provided to the commissioners or the building management system, resulting in more reasonable and reliable commissioning decisions, especially when budget and staff resources are limited [13]. Moreover, modeling operational faults is critical to achieving more reliable energy model calibrations when most energy models for existing buildings assume ideal conditions without any operational problems.…”
Section: Figure 1 Potential Hvac Operational Faults In a Typical Vav mentioning
confidence: 99%
“…Modeling and simulation allows for an estimation of the severity of common faults and, thus, supports decision making about timely fault corrections-which can then enable efficient system operation, improve indoor thermal comfort, reduce equipment downtime, and prolong equipment service life [11][12][13]. It can also support commissioning efforts by providing estimates for potential energy/cost savings that could be achieved by fixing the faults during retro-commissioning.…”
Section: Figure 1 Potential Hvac Operational Faults In a Typical Vav mentioning
confidence: 99%
“…Others demonstrate savings based on a commissioning process of between 7-12% [3] and [4], referes to a number of other published work on energy savings due to commissioning. More support are to be found in [5] and [6] which propose energy savings in less quantified terms.…”
Section: Page 3 Of 21mentioning
confidence: 99%
“…The Cardullo [2] technology was introducing as a transponder with memory, hence being able to relate the identification with extra meta-data/information read by external readers. Michael [3] presents a history of automatic identification technologies, from bar codes, to magnetic-stripe cards, smart cards, biometrics and RFID tags, with a very large literature survey on the topic. A reasonable set of applications throughout history are stated by Russos and Vassilis [4].…”
Section: Page 5 Of 21mentioning
confidence: 99%
“…Besides, due to the lack of comprehensive and detailed monitored data, the previous studies and projects mainly focus on some aspects of the building energy performance, or portion of the building systems. For example, only energy use patterns or system operating efficiency is analyzed, only lighting system or heating, ventilation and air conditioning (HVAC) system is considered [23,24].…”
Section: Introductionmentioning
confidence: 99%