2011 6th IEEE International Symposium on Applied Computational Intelligence and Informatics (SACI) 2011
DOI: 10.1109/saci.2011.5872969
|View full text |Cite
|
Sign up to set email alerts
|

Monitoring and control of liquid nitrogen level of the <sup>13</sup>C separation column using NI PXI-1031

Abstract: This paper is a step forward by making real time control system design to monitor and control process variables to ensure its smooth operation and desired reliability. Liquid nitrogen level in the condenser is a core component of isotopic separation process to obtain (¹³C), so is needed a special focus on monitoring and control. The goal of the work is to design a controller for the liquid nitrogen in the condenser of (¹³C) isotope separation column using NI-PXI 1031 (PCI eXtensions for Instrumentation) from N… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2012
2012
2012
2012

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(3 citation statements)
references
References 6 publications
(10 reference statements)
0
3
0
Order By: Relevance
“…Because no (CO) gas is extracted from the column, it accumulates in the boiler. The start mode finish when the (CO) level has a desired set point in the boiler [12].…”
Section: Process Decriptionmentioning
confidence: 99%
See 2 more Smart Citations
“…Because no (CO) gas is extracted from the column, it accumulates in the boiler. The start mode finish when the (CO) level has a desired set point in the boiler [12].…”
Section: Process Decriptionmentioning
confidence: 99%
“…For this reason that between the two phases take place a contact, the ( 13 C) concentration rises in the liquid phase. After a certain period of time, which can be days or weeks, the concentration of ( 13 C) reaches the requested level [12].…”
Section: Process Decriptionmentioning
confidence: 99%
See 1 more Smart Citation