2022
DOI: 10.3390/en16010395
|View full text |Cite
|
Sign up to set email alerts
|

Modern Bitumen Oil Mixture Models in Ashalchinsky Field with Low-Viscosity Solvent at Various Temperatures and Solvent Concentrations

Abstract: The article analyzes the modern theory and practice of pipeline transport of bituminous oil together with low-viscosity solvent. In addition, a detailed analysis of the rheological models of non-Newtonian fluids is carried out, which establishes a number of assumptions on the rheology model selection algorithm currently in use (limited number of rheological models, variability in model coefficient assignment, etc.). Ways of their elimination are proposed. Dependencies for determination of the dynamic viscosity… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
2
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 16 publications
(14 citation statements)
references
References 46 publications
0
2
0
Order By: Relevance
“…The development of a pioneer trench should be carried out at a time when there is little water (September-April), that is, at a time when the channel is least silenced with deposition. The length, width and depth of the pioneer ditch should be determined depending on the location of the intake channels, the point of intake of the river without a dam and the low water period of the river [16]. When conducting experimental studies, the curve of gravity parameters of the flow in the right direction does not choose the number of stvors 3, taking into account the complexity of the dynamics of motion of the flow in the opposite direction.…”
Section: Resultsmentioning
confidence: 99%
“…The development of a pioneer trench should be carried out at a time when there is little water (September-April), that is, at a time when the channel is least silenced with deposition. The length, width and depth of the pioneer ditch should be determined depending on the location of the intake channels, the point of intake of the river without a dam and the low water period of the river [16]. When conducting experimental studies, the curve of gravity parameters of the flow in the right direction does not choose the number of stvors 3, taking into account the complexity of the dynamics of motion of the flow in the opposite direction.…”
Section: Resultsmentioning
confidence: 99%
“…The authors' technique, intended for solving spatio-temporal problems, can also be used to predict the degree of hydrocarbon vapor capture [73], or when modeling bitumenoil mixtures [74].…”
Section: Discussionmentioning
confidence: 99%
“…The structural scheme of the in-soil irrigation element mode working part and its main parameters work in the following order: the in-soil irrigation system is made of polyethylene pipes and includes water storage, water purification, water supply, water distribution, and irrigation parts. Having been highly dependable on the location of the working parts of the system, the type and number of elements included in the system may differ from other ones [17][18][19][20][21].…”
Section: Methodsmentioning
confidence: 99%