2022
DOI: 10.15276/aait.05.2022.14
|View full text |Cite
|
Sign up to set email alerts
|

Models of risk management in development projects for housing and utility service providers

Abstract: The article describes a method for developing and modelling composite web-services. Web-service composition is used to derive new functionality from the interaction of existing web-services. Composite web-services are built in several stages: specifications (determining the type of service); development of the structure of the service based on the algebra of services; service composition modelling; selecting a service variant and generating a service. The main elements … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 13 publications
(13 reference statements)
0
2
0
Order By: Relevance
“…After that, the model was modified (Fig. 6) for further research, namely, to find the values of the coefficients of the PI controller [23], [24], [25] which bring the transient process of a real system with a transport delay as close as possible to the transient process of a system in which there is no transport delay [26,27]. Taking into account the peculiarities of the control object, the search for optimal coefficients of the PI controller, which would provide the desired characteristics of transient processes, is proposed to be performed by minimizing the deviation of the real transient process from the target.…”
Section: Computer Simulation Of Transient Processes Of the Liquid Lev...mentioning
confidence: 99%
“…After that, the model was modified (Fig. 6) for further research, namely, to find the values of the coefficients of the PI controller [23], [24], [25] which bring the transient process of a real system with a transport delay as close as possible to the transient process of a system in which there is no transport delay [26,27]. Taking into account the peculiarities of the control object, the search for optimal coefficients of the PI controller, which would provide the desired characteristics of transient processes, is proposed to be performed by minimizing the deviation of the real transient process from the target.…”
Section: Computer Simulation Of Transient Processes Of the Liquid Lev...mentioning
confidence: 99%
“…Paper [11] further developed the information model of interaction between stakeholders of organizational projects in the field of aircraft maintenance by reducing the impact of the risks of each stakeholder, taking into account the factors of behavioral economics. The results of this study will be useful in the process of developing information technology for risk management in IT projects, taking into account the impact of threats and opportunities.…”
Section: Analysis Of Literary Datamentioning
confidence: 99%