2016
DOI: 10.1051/matecconf/20168605023
|View full text |Cite
|
Sign up to set email alerts
|

Modelling of organizational and technological parameters of the informational model of municipal infrastructure facilities subject to reorganization

Abstract: Abstract. This article describes constructing methods of an information reorganization facility model based on parametric mathematical methods. The principles of reorganization parameter selection at the stage of municipal infrastructure facility pre-operation are described. The algorithm of information model building of facilities reorganization, as well as information model of organization processes of reorganization are being shown.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0
1

Year Published

2017
2017
2017
2017

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 10 publications
(10 citation statements)
references
References 7 publications
0
9
0
1
Order By: Relevance
“…Another group of galvanic sludge contains product of etching the surface of aluminum along with heavy metals and calcium foods, is also supplied to the station of neutralization. Their content does not exceed 10 %, and the dried product is more dispersed [3,15,16].…”
Section: Chemical Methods Of Treatmentmentioning
confidence: 99%
See 1 more Smart Citation
“…Another group of galvanic sludge contains product of etching the surface of aluminum along with heavy metals and calcium foods, is also supplied to the station of neutralization. Their content does not exceed 10 %, and the dried product is more dispersed [3,15,16].…”
Section: Chemical Methods Of Treatmentmentioning
confidence: 99%
“…In addition, ion exchange purification does not solve the problem of disposal of eluates. Another drawback of this method is the considerable investment and operating costs (high cost of reagent per unit of the remote metal) [16][17][18].…”
Section: Ion Exchange Methods Of Treatmentmentioning
confidence: 99%
“…1. Scheme of primary clarifier with bioflocculation chamber: 1 -inlet of waste water and sludge; 2 -distribution chamber; 3 -bioflocculation zone; 4 -perforated aerators; 5 -semisubmerged partition wall; 6 -submerged walls; 7 -low-rate mixer; 8 -protection shield; 9 -collection weir; 10 -thin-layer blocks After the bioflocculation waste water passes under the baffle zone of air separation, where the adhering air bubbles separated to prevent possible degradation of the sedimentation conditions [8].…”
Section: Methods Of Intensificationmentioning
confidence: 99%
“…After anoxic tank the sludge mixture sequentially passes through the three aerobic reactor (AR), equipped with a system of fine-bubble aeration. The first and second AR is equipped with a floating feed for immobilization of biofilms (Figure 3), thus treatment goes by a combination of biomass: free-floating and attached [8,9,[19][20][21][22][23][24]. After aerobic reactors the sludge mixture enters the clarifier where the water is separated from sludge, which is pumped by airlift pumps back to the anaerobic reactor.…”
Section: Technologymentioning
confidence: 99%