2009
DOI: 10.1016/j.na.2009.01.230
|View full text |Cite
|
Sign up to set email alerts
|

Modelling nitrogen dynamics of a constructed wetland: Nutrient removal process with variable yield

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2011
2011
2022
2022

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 14 publications
0
4
0
Order By: Relevance
“…Author details 1 Department of Mathematics, Huanghuai University, Zhumadian, Henan 463000, P.R. China.…”
Section: Discussionmentioning
confidence: 99%
“…Author details 1 Department of Mathematics, Huanghuai University, Zhumadian, Henan 463000, P.R. China.…”
Section: Discussionmentioning
confidence: 99%
“…B. Burgin (2000), W. M. Getz & J. O. Lloyd-Smith (2006), and S. R.-J. Jang (2008) were interested in discrete epidemic models while K. Bunwong et al (2009) studied nutrient removal process on a continuous time model.…”
Section: The Classical Concept Of Ecological Modellingmentioning
confidence: 99%
“…The removal of the sewage from a water body by the biodegradation has been investigated by many researchers [3][4][5][6][7][8][9][10][11][12][13][14][15]. In [14], pollutant removal process of a constructed wetland is simulated by the following model:…”
Section: Introductionmentioning
confidence: 99%
“…The meaning of other parameters is also given in [14]. Scott et al [15] propose a mathematical model for dispersal of bacterial inoculants colonizing the water rhizosphere to describe bacterial growth and movement in the rhizosphere.…”
Section: Introductionmentioning
confidence: 99%