2017
DOI: 10.1080/00207543.2017.1349949
|View full text |Cite
|
Sign up to set email alerts
|

Modelling and solving algorithm for two-stage scheduling of construction component manufacturing with machining and welding process

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 13 publications
(1 citation statement)
references
References 37 publications
0
1
0
Order By: Relevance
“…Although designed for the autoclave processing of aerospace composite parts, the APOLLO tool is suitable for many scenarios with the combination of discrete manufacturing followed by batch processing. Remotely similar two-stage optimisation problems can be found in Liu et al (2017) and Meng et al (2018).…”
Section: Apollo -Autoclave Production Order Layup and Logistics Optimentioning
confidence: 99%
“…Although designed for the autoclave processing of aerospace composite parts, the APOLLO tool is suitable for many scenarios with the combination of discrete manufacturing followed by batch processing. Remotely similar two-stage optimisation problems can be found in Liu et al (2017) and Meng et al (2018).…”
Section: Apollo -Autoclave Production Order Layup and Logistics Optimentioning
confidence: 99%