2007
DOI: 10.1109/tpwrd.2006.886788
|View full text |Cite
|
Sign up to set email alerts
|

Modelling and Simulation for Performance Evaluation of IEC61850-Based Substation Communication Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
111
0
2

Year Published

2012
2012
2021
2021

Publication Types

Select...
5
3
2

Relationship

0
10

Authors

Journals

citations
Cited by 211 publications
(113 citation statements)
references
References 2 publications
0
111
0
2
Order By: Relevance
“…Since it is widely expected that at least, if not all, part of the smart grid will use IP-based protocols (e.g., IEC 61580 [35] has already adopted TCP/IP as a part of its protocol stacks) and TCP/IP is vulnerable to DoS attacks. DoS attacks against TCP/IP have been well studied in the literature regarding attacking types, prevention and response [36]- [38].…”
Section: Availabilitymentioning
confidence: 99%
“…Since it is widely expected that at least, if not all, part of the smart grid will use IP-based protocols (e.g., IEC 61580 [35] has already adopted TCP/IP as a part of its protocol stacks) and TCP/IP is vulnerable to DoS attacks. DoS attacks against TCP/IP have been well studied in the literature regarding attacking types, prevention and response [36]- [38].…”
Section: Availabilitymentioning
confidence: 99%
“…IEC 61850 was originally developed for implementing interoperability among different devices and systems of different vendors in substation, and it currently has been extended and applied in various fields of power system [28][29][30][31][32]. The necessity of implementing HAM based on IEC 61850 is described as follows: (1) with the performance and security, enabling integration of protection, control, measurement and other functions.…”
Section: Analysis On Necessity and Feasibilitymentioning
confidence: 99%
“…A generic modeling technique of intelligent electronic device (IED) and the setup of a research platform using the OPNET Modeler were introduced in [8]. It explained about how to create and setup a platform for the performance study of an IEC 61850-based substation communication system by modeling devices with the specific protocol stack.…”
Section: Related Workmentioning
confidence: 99%