Modelling and allocation of open‐UPQC‐integrated PV generation system to improve the energy efficiency and power quality of radial distribution networks

Abstract: The study presents the modelling and allocation strategy for open unified power quality conditioner (UPQC-O) integrated photovoltaic (PV) generation system in radial distribution networks to improve the energy efficiency and PQ. An UPQC is a custom power device, which consists of series and shunt inverters. In UPQC-O, these inverters are placed in different locations in a network. There is a communication channel to share the information among these inverters to select the respective set point. Two models prop… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
27
0
1

Year Published

2018
2018
2024
2024

Publication Types

Select...
6
2

Relationship

1
7

Authors

Journals

citations
Cited by 49 publications
(29 citation statements)
references
References 42 publications
(77 reference statements)
0
27
0
1
Order By: Relevance
“…The percentage of total load protected from a given value of upstream voltage sag is called PVSML. PVSML at bus j is calculated as [14] PVSML j = Re V¯j I¯* o j TPAPD base + PL 1 × 100 (6) where V¯j is the voltage at bus j, I¯* o j is the line current flowing from bus o to j. TPAPD base is the total peak active power demand of base-case network and it is determined by aggregating the peak active power load demand of all the buses of a network. PL 1 is the base-case network power loss during peak demand hour.…”
Section: • Percentage Of Voltage Sag Mitigated Load (Pvsml) Constraintmentioning
confidence: 99%
See 2 more Smart Citations
“…The percentage of total load protected from a given value of upstream voltage sag is called PVSML. PVSML at bus j is calculated as [14] PVSML j = Re V¯j I¯* o j TPAPD base + PL 1 × 100 (6) where V¯j is the voltage at bus j, I¯* o j is the line current flowing from bus o to j. TPAPD base is the total peak active power demand of base-case network and it is determined by aggregating the peak active power load demand of all the buses of a network. PL 1 is the base-case network power loss during peak demand hour.…”
Section: • Percentage Of Voltage Sag Mitigated Load (Pvsml) Constraintmentioning
confidence: 99%
“…Thus, they are capable of only injecting active power into the network during the operational hour. • The PV generation hours and the peak demand hours do not coincide with each other [14]. The peak demand takes place during evening 6 to 10 PM and this duration is named as peak hour.…”
Section: Assumptionsmentioning
confidence: 99%
See 1 more Smart Citation
“…Modeling, insertion of 'Open-UPQC' integrated PVG-system for improving efficiency of energy & PQof Radial-Distribution-Networks.Similar way UPQC-OWOB, energy extracted from PVA will directly given to the model. Recommended models incorporates in forward&backward-sweeps of load flows to evaluate operating-parameters like node-voltage [14][15][16][17][18].…”
Section: Introductionmentioning
confidence: 99%
“…For instance, the stable control issue of dc-bus voltage, which is closely related to the PV array output power from the point of photovoltaic generation and the compensation effect from the perspective of power quality regulation. Most existing literature pay more attention to the model and control of series and shunt compensators [32][33][34], with a lack of discussion on the schemes for dc-bus voltage stability under solar irradiance fluctuation and grid disturbances. Recently, some researchers have been gradually paying attention to the dc-bus voltage regulation.…”
Section: Introductionmentioning
confidence: 99%