2020 13th International Conference "Management of Large-Scale System Development" (MLSD) 2020
DOI: 10.1109/mlsd49919.2020.9247777
|View full text |Cite
|
Sign up to set email alerts
|

Modeling of Product Life Cycle Stages Optimization Taking into Consideration Uncertainty of the Main Parametrical Variables

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
9
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 21 publications
(9 citation statements)
references
References 2 publications
0
9
0
Order By: Relevance
“…The tests are completed with the acceptance of an pilot batch of vehicles, which is being validated for compliance with the input requirements. Acceptance is also one of the processes for formally completing a project to develop a new car model [22].…”
Section: Study and Resultsmentioning
confidence: 99%
“…The tests are completed with the acceptance of an pilot batch of vehicles, which is being validated for compliance with the input requirements. Acceptance is also one of the processes for formally completing a project to develop a new car model [22].…”
Section: Study and Resultsmentioning
confidence: 99%
“…By solving numerically the semi-analytical equation (15), one can find the dependence h(x), then using ( 7) and (4) calculate v(x).…”
Section: Gutter With Plugmentioning
confidence: 99%
“…or, replacing h(l) by its expression in equation ( 13), ( , the nature of the flow will not change, but the amount of liquid will be even less, and the active length cos l  the groove will shrink [15].…”
Section: Chute With a Critical Angle Of Inclinationmentioning
confidence: 99%
“…Power: 2 engines of 200 hp, total 400 hp (294 kW); Number of passengers: 5 passengers, mail, cargo (total 500-700 kg) Flight range, cruising and maximum flight speeds are specified in the source data at the first stages of the life-cycle [8,9], since these characteristics are the main criteria.…”
Section: Initial Datamentioning
confidence: 99%