2014
DOI: 10.1109/jsyst.2013.2297751
|View full text |Cite
|
Sign up to set email alerts
|

Modeling of ERTMS Level 2 as an SoS and Evaluation of its Dependability Parameters Using Statecharts

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
6
2
1

Relationship

1
8

Authors

Journals

citations
Cited by 19 publications
(7 citation statements)
references
References 27 publications
0
7
0
Order By: Relevance
“…For rail traffic management and control systems included in the highest fourth SIL (Safety Integrity Level), THR values should be in the range 8 9 10 10 − − < ≤ THR . In addition to the THR indicator mentioned above, rail traffic management and control systems (hardware, software) can be analyzed using FMEA, FTA or Markov chain, [8], [9], [14]. The latter uses continuous-time processes that correlate with the Poisson process.…”
Section: Fundamentals Of Safety Analysis Of Rail Traffic Management Amentioning
confidence: 99%
“…For rail traffic management and control systems included in the highest fourth SIL (Safety Integrity Level), THR values should be in the range 8 9 10 10 − − < ≤ THR . In addition to the THR indicator mentioned above, rail traffic management and control systems (hardware, software) can be analyzed using FMEA, FTA or Markov chain, [8], [9], [14]. The latter uses continuous-time processes that correlate with the Poisson process.…”
Section: Fundamentals Of Safety Analysis Of Rail Traffic Management Amentioning
confidence: 99%
“…CE occurs for the first time at the n-th period when the initial state is i and when the component stays in this state during n [24]. However, it directly models s specific railway system in order to evaluate its dependability parameters but it does not perform qualitative analysis using FT.…”
Section: Necessity Of a New Approach For Modelling The Critical Eventmentioning
confidence: 99%
“…In this sense, [17] presents a Unified Modeling Language (UML) model for the ERTMS Level 2. This model can be used to perform simulations and obtain the Reliability, Availability, and Maintainability (RAM) values in order to verify that the railway system is meeting specific RAM goals such as a specific value of unavailability.…”
Section: Related Workmentioning
confidence: 99%