2014
DOI: 10.1016/j.ejor.2013.08.050
|View full text |Cite
|
Sign up to set email alerts
|

Modeling and solution of the joint quay crane and truck scheduling problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
33
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 103 publications
(33 citation statements)
references
References 24 publications
0
33
0
Order By: Relevance
“…PSO was proposed to optimize continuous nonlinear functions. In recent years, the PSO has been successfully used to solve certain port operation problems, e.g., BAPs [28] and QC scheduling problems [27]. This article designs a PSO based solution approach to solve model T AP .…”
Section: Pso Based Solution Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…PSO was proposed to optimize continuous nonlinear functions. In recent years, the PSO has been successfully used to solve certain port operation problems, e.g., BAPs [28] and QC scheduling problems [27]. This article designs a PSO based solution approach to solve model T AP .…”
Section: Pso Based Solution Methodsmentioning
confidence: 99%
“…Objective (24) is similar to the previous defined objective. In Constraints (25)(26)(27)(28), λ ipi p is defined to linearize " γ ip · γ i p ," which is contained in Objective (9). Constraints (29)(30)(31) link the previously defined core variables (γ ip , α i , ε i ) with the new variable β iptd , which is also the most important variable in the model T AP Bal .…”
Section: Mathematical Modelmentioning
confidence: 99%
“…There are nonlinear terms in constraint (2)(3)(4)(5)(6)(7)(8)(9)(10)(11)(12)(13)(14)(15)(16)(17), which computes the empty travel time of a YC, i.e., when it travels between the destinations of two inbound shipments. These terms can be linearized by introducing new binary variables of the form θ i,k,j,l to denote whether inbound shipments i, j ∈ C u are assigned to yards locations k, l ∈ L u .…”
Section: Constraintsmentioning
confidence: 99%
“…He J et al [15] address the problem of integrated quay crane scheduling, internal truck scheduling, and yard crane scheduling. Tang L et al [16] address the joint quay crane and truck scheduling problem at a container terminal, considering the coordination of the two types of equipment to reduce their idle time between performing two successive tasks. Li W et al [17] develop an efficient continuous time MILP model for yard crane scheduling.…”
Section: Introductionmentioning
confidence: 99%