2022
DOI: 10.31000/jika.v6i1.5496
|View full text |Cite
|
Sign up to set email alerts
|

Model Penentuan Urgensi Perbaikan Tower Menggunakan Metode MOORA

Abstract: Quality control can suppress or reduce the volume of errors and repairs in the future where it can also minimize costs incurred by the company if later there is damage. These activities must be carried out carefully and effectively so that the results obtained are in accordance with the initial objectives. In fact, the implementation of equipment quality control activities in the field at PT. Indonesia Comnets Plus SBU Regional Sumbagsel is still done manually so it is not practical and takes a lot of time. Th… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 5 publications
0
2
0
Order By: Relevance
“…Research conducted by (Abdurrasyid et al, 2022) at PT. Indonesia Comnets Plus SBU Regional Sumbagsel determines the level of urgency of tower repairs using the MOORA method with 100% accurate results.…”
Section: B) Literature Researchmentioning
confidence: 99%
See 1 more Smart Citation
“…Research conducted by (Abdurrasyid et al, 2022) at PT. Indonesia Comnets Plus SBU Regional Sumbagsel determines the level of urgency of tower repairs using the MOORA method with 100% accurate results.…”
Section: B) Literature Researchmentioning
confidence: 99%
“…Indonesia Comnets Plus SBU Regional Sumbagsel that determining the level of urgency to improve the damaged towers is still being done manually. Determine the severe damage using MOORA (Abdurrasyid, Nugroho, Dakhlan, Arman, & Mahayana, 2022), and the same thing is applied to the priority of selecting tower construction areas because the high cost of building a tower is the reason for providers to be selective and right on target in determining the location of tower construction using the AHP method and MOORA (Pane & Erwansyah, 2020).…”
Section: Introductionmentioning
confidence: 99%