2021
DOI: 10.1111/itor.13079
|View full text |Cite
|
Sign up to set email alerts
|

Model‐based solution approach for a short‐term flight rescheduling problem in aerial passenger transportation to maritime units

Abstract: This paper addresses the problem faced by a Brazilian oil and gas company of recovering flights for passenger transportation (mainly teams of employees) to maritime units. Due to unexpected events such as bad weather or aircraft mechanical failures, the original timetable very often cannot be fully met, resulting in flight delays on the same day or even postponements to the following days. As a result, the operation of the maritime units and the scheduling of employee shifts are affected to some extent. Based … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(6 citation statements)
references
References 66 publications
0
4
0
Order By: Relevance
“…However, trips are still prone to failure due to insufficient vehicles. Some studies [9,18,19] have introduced time-delay windows into models and obtained higher-quality rescheduled plans through reasonable time-sharing of vehicle resources. Wang [20] additionally calculated the delays of each train to reduce the aftereffects of rescheduling.…”
Section: Related Workmentioning
confidence: 99%
See 1 more Smart Citation
“…However, trips are still prone to failure due to insufficient vehicles. Some studies [9,18,19] have introduced time-delay windows into models and obtained higher-quality rescheduled plans through reasonable time-sharing of vehicle resources. Wang [20] additionally calculated the delays of each train to reduce the aftereffects of rescheduling.…”
Section: Related Workmentioning
confidence: 99%
“…. , f K }, the total cost of the optimization scheme is represented by Formula (19). Finally, to minimize the total cost, the optimal value of an initial state is given by function (20) [30].…”
Section: Dynamic Programmingmentioning
confidence: 99%
“…Gurtner et al (2021) propose an agent-based air traffic delay management model through four-dimensional trajectory adjustment in a European airport network. De La Vega et al (2022) propose to solve a short-term flight rescheduling problem to recover flight delays in the context where employees of a gas and oil company need to be transported to maritime units.…”
Section: Tactical Handling Of Airside Operationsmentioning
confidence: 99%
“…De La Vega et al. (2022) propose to solve a short‐term flight rescheduling problem to recover flight delays in the context where employees of a gas and oil company need to be transported to maritime units.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The model presented in this section is inspired in other models used for scheduling problems, based on discrete-time representation [14,7]. In this model, we use parameter pi = ⌊p i /24⌋ to translate continuous time (in hours) to time periods (in days).…”
Section: Lmsp-m1mentioning
confidence: 99%