2019
DOI: 10.1016/j.ijepes.2019.03.007
|View full text |Cite
|
Sign up to set email alerts
|

Mixed-integer linear programming method for coordination of overcurrent and distance relays incorporating overcurrent relays characteristic selection

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
12
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 27 publications
(12 citation statements)
references
References 24 publications
0
12
0
Order By: Relevance
“…OCRs coordination causes large and unacceptable operating times for OCRs, especially in large networks [5]. These issues demonstrate the necessity of using breakpoints (BP) for converting meshed networks to radial ones in order to achieve proper OCRs coordination.…”
Section: • the Weakness Of Intelligent Optimization Algorithms Formentioning
confidence: 99%
See 4 more Smart Citations
“…OCRs coordination causes large and unacceptable operating times for OCRs, especially in large networks [5]. These issues demonstrate the necessity of using breakpoints (BP) for converting meshed networks to radial ones in order to achieve proper OCRs coordination.…”
Section: • the Weakness Of Intelligent Optimization Algorithms Formentioning
confidence: 99%
“…Table 1 shows the sum of operating times of OCRs for all 36 possible choices of MBPS. These operating times are calculated for maximum SCCs in the OCRs' own protection zones, mentioned in [5]. As can be seen, if {6,8} or {3,11} is selected as the MBPS, the sum of operating times will be 5.25 seconds (the maximum value) and 4.33 seconds (the lowest value), respectively.…”
Section: Problem Statementmentioning
confidence: 99%
See 3 more Smart Citations